ppr水管在連接時(shí),無(wú)旋轉(zhuǎn)地把管端導(dǎo)入加熱套管內(nèi),插入到所標(biāo)志的---,同時(shí)無(wú)旋轉(zhuǎn)地把管件推到加熱管上,pvc管業(yè)加工,達(dá)到規(guī)定標(biāo)志處。一般地可用心中默讀數(shù)字法掌握加熱時(shí)間,或觀察管件、管材的加熱程度,當(dāng)模頭上出現(xiàn)一圈ppr熱熔凸緣時(shí),即可將管材、管件從模頭上取下進(jìn)行下道工序。
when the ppr water pipe is connected,pvc管業(yè)廠家, the pipe end is led into the heating sleeve without rotation&inserted to the marked depth. at the same time, the pipe fitting is pushed onto the heating pipe without rotation to reach the specified mark. generally, the heating time can be mastered by reading numbers in heart,/the heating degree of pipe fittings&pipes can be observed. when a circle of ppr hot-melt flange appears on the die head, the pipe&pipe fittings can be removed from the die head for the next process.
鋪設(shè)好的冷熱水管一定要用卡扣固定好,避免后期裝修過(guò)程中水管移位,導(dǎo)致接頭脫落、松動(dòng),產(chǎn)生漏水---。盡量做到每隔60cm就要安裝一個(gè)卡子,切記卡子安裝一定要牢固。成品保護(hù)很重要,鋪設(shè)的水管,避免有重物壓在水管上。
water pipe le
the laid cold&hot water pipe must be fixed with clamps to avoid the displacement of the water pipe in the later decoration process, which leads to the joint falling off&loosening,&the potential water leakage will occur. try to install a clip every 60cm,&remember that the clip must be firmly installed. the finished product protection is very important. the water pipe laid should be protected from heavy loads on the water pipe.
冷熱水管不要同槽
水路改造時(shí),冷熱水管要不要同槽,而且兩者之間距離保持10cm以上。如果熱水管緊挨冷水管,pvc管業(yè),會(huì)降低熱水管的保溫性,熱水很快就會(huì)變冷。這里還要提醒大家,咸寧pvc管業(yè),水管開(kāi)槽較深,要避免開(kāi)開(kāi)橫槽,橫槽會(huì)破壞墻體結(jié)構(gòu)。
hot&cold water pipes should not be in the same tankin waterway rectruction, whether the cold&hot water pipes should be in the same groove,&the distance between them should be kept at least 10 cm. if the hot water pipe is close to the cold water pipe, the heat preservation of the hot water pipe will be reduced,&the hot water will soon become cold. here also reminds everybody, the water pipe groove is deep, must avoid to open the transverse groove, the transverse groove will destroy the wall structure.