pbt/ds01印刷 系列pa66 24ae1、pp j106g 、pp 110axt、pa66 6410g3、tpe 3655b/n、pp ep200r、pc 3110g、pa66 a548b2v15、pa46 tw242fm10、
pom k900、pom kfl34xxcpbt wfl34h、pp mv00cs 、pp n10n-00、pa6 h3cw、pp hp509n、pp mfb22s 、pa66 rc-1004、tpe tf5aac、
pc 925pa6 t-40、ppo 731s-gy1e450f、tpe gls 341-007
pc plastic products due to cost&other aspects, using modified materials, espelly electrical products, but also increase the fire performance, in flame retardant pc&other plastic alloy products molding, injection molding machine for the plasticizing system requirements are mixed, good corrosion resistance, the conventional plasticizing screw to do, at the time of purchase, must be stated in advance.
pbt/ds01印刷 系列pom kf-1004d、pp 30ym240、pp 30、pc 1080dvd、pp l24g-00、pc/pbt gf-30、pbt hi2152、pom n2650z6lev、pc 943、
tpe 4150、pps a630t30pp mx89510、tpe 2065b/8901、pei 2210epr、pc lds3750、tpu 5713、pmma zk5hf、pa66 rf0069rs、pbt tv4220、
pp 4018petg gn071、eva 90-e607d-88nt、pa6 brz334h
[production stoppage] when the production process is going to stop for a short time, the hopper should be closed, the cylinder will be emptied&the screw is in the front position,&the temperature of the barrel can be maintained. for 1 ~ 2 hours of production stop, the same step should be adopted, but the temperature of the barrel should be reduced to 260 c. when the machine is opened, the new material is used to flush the barrel. for flame-retardant grade, the barrel should be washed with hdpe before the machine is pause.